50+ Things to Plan During Your Home Build (Not After)
When I built my own home as the general contractor, I kept a running list of what I'd do differently. These are my homeowner tips — not building specs. Confirm details with your builder and licensed trades, and check local code.
By Lavell Jackson · Broker/Owner · KY License #274290 · Retired U.S. Army · Reviewed
Water and drainage
Confirm with your builder and a licensed plumber and local code.
Plumbing
Confirm with your builder and a licensed plumber and local code.
Electrical and lighting
A licensed electrician confirms placement, GFCI and code.
Confirm with your builder and a licensed electrician and local code.
Before drywall





Internet and low voltage
Confirm with your builder and a licensed electrician and local code.
HVAC and insulation
A licensed HVAC contractor should do the load and duct design.
Confirm with your builder and a licensed HVAC contractor and local code.
Structure, doors and finishes
Confirm with your builder and a licensed builder or contractor and local code.



Managing the build
From being my own general contractor.
Confirm with your builder and a licensed builder or contractor and local code.
Dry-in / exterior

52 items total.
Checklist questions
What should I plan before drywall?
Anything inside the walls: outlets and switches, network and speaker wire, wall backing, plumbing for future water treatment, gas stubs and HVAC runs. Test the electrical and take photos and video of every wall before it's closed.
Can I customize a builder-community home?
Usually within the builder's options — plans, selections and some upgrades. What you can change, and when, depends on the builder and your contract, so ask early.
Which items need a licensed contractor?
Electrical, plumbing, gas and HVAC work should be done or confirmed by licensed trades and must meet local code. These are my homeowner tips, not building specs.