50+ Things to Plan During Your Home Build (Not After)

When I built my own home as the general contractor, I kept a running list of what I'd do differently. These are my homeowner tips — not building specs. Confirm details with your builder and licensed trades, and check local code.

By Lavell Jackson · Broker/Owner · KY License #274290 · Retired U.S. Army · Reviewed

Water and drainage

Confirm with your builder and a licensed plumber and local code.

Plumbing

Confirm with your builder and a licensed plumber and local code.

Electrical and lighting

A licensed electrician confirms placement, GFCI and code.

Confirm with your builder and a licensed electrician and local code.

Before drywall

From a client's custom build I helped with.
Electrical breaker panel with circuit labels during construction
From a client's custom build I helped with.
HVAC air handler installed in a utility closet during construction
From a client's custom build I helped with.
Bathroom plumbing rough-in behind the wall before fixtures
From a client's custom build I helped with.
Bedroom with vaulted ceiling at drywall stage
From a client's custom build I helped with.
Bedroom at drywall stage with a double window
From a client's custom build I helped with.

Internet and low voltage

Confirm with your builder and a licensed electrician and local code.

HVAC and insulation

A licensed HVAC contractor should do the load and duct design.

Confirm with your builder and a licensed HVAC contractor and local code.

Structure, doors and finishes

Confirm with your builder and a licensed builder or contractor and local code.

Soaking tub installation below a bathroom window
From a client's custom build I helped with.
Bathroom vanity cabinets before countertop and sink installation
From a client's custom build I helped with.
Bedroom with painted walls and baseboard trim before flooring
From a client's custom build I helped with.

Managing the build

From being my own general contractor.

Confirm with your builder and a licensed builder or contractor and local code.

Dry-in / exterior

Custom home exterior at house-wrap stage before siding
From a client's custom build I helped with.

52 items total.

Checklist questions

What should I plan before drywall?

Anything inside the walls: outlets and switches, network and speaker wire, wall backing, plumbing for future water treatment, gas stubs and HVAC runs. Test the electrical and take photos and video of every wall before it's closed.

Can I customize a builder-community home?

Usually within the builder's options — plans, selections and some upgrades. What you can change, and when, depends on the builder and your contract, so ask early.

Which items need a licensed contractor?

Electrical, plumbing, gas and HVAC work should be done or confirmed by licensed trades and must meet local code. These are my homeowner tips, not building specs.